TradeIndia
voice search
Coriander Ator Hybrid Seeds
Share

Coriander Ator Hybrid Seeds

Price:

Get Latest Price

In Stock

In Stock

Product Specifications

Payment TermsDelivery Point (DP), Letter of Credit (L/C), Telegraphic Transfer (T/T)
Delivery Time2 Week
Main Export Market(s)Asia

Product Overview

Key Features

- 1st harvest within 45 days after spreading seeds.
- 3-4 times cutting in every 30 days interval.
- Cultivation: row 3 feet wide, row to row 1-feet gap. Spread 0.046gm seed per square feet. - Fertilizer: mix compost or cow dung 229.32 gm, TSP 1.52gm, MOP 0.71gm, urea 0.76gm, gypsum 0.91gm, Zinc sulphet 0.15gm and granular pesticide 0.15gm per square feet. Spreading seeds after 7 days giving above mentioning fertilizer in the bed soil.
- Nursing: mix liquid fertilizer 5ml, pesticide sypermathin 1ml, fungicide mankogeb with matalaxil 1gm. Mix all with 5-liter water then spray every 10 days interval.
- Top dressing: mix MOP 0.61gm, urea 0.61gm. Apply this mixture over the seedbed every 21 days interval. We are cultivating in this process. Keep row/bed 6-9 inches high for rainy season.

Company Details

Beejghar Seed Company, Registered in 2009 at Silhat in Silhat, is a leading Supplier of Seeds in Bangladesh. Beejghar Seed Company is one of Trade India's verified and trusted sellers of listed products. With extensive experience in supplying and trading Coriander Ator Hybrid Seeds, Beejghar Seed Company has made a reputed name for itself in the market with high-quality Coriander Ator Hybrid Seeds, Cowpea HYV Bafi 1 Seeds, F1 Hybrid Okra Padma Seeds, etc.
Focusing on a customer-centric approach, Beejghar Seed Company has a pan-India presence and caters to a huge consumer base throughout the country. Buy Seeds in bulk from Beejghar Seed Company at Trade India quality-assured products.

Business Type

Supplier

Related Products

Explore Related Categories

Seller Details

Silhat, Silhat

M A Muquith

Address

null Silhat, Silhat, 3100, Bangladesh

coriander seeds in Silhat

Report incorrect details

More Product From This seller

Compare With Similar Products

Buyer Feedback

5

Hybrid

Delivery Time

2 Week

3 Days

02 Week

Payment Terms

Letter of Credit (L/C)

Cash in Advance (CID)

Supply Ability

36000 Per Month

On Order Per Day

People Also Viewed